Description
The building was completely renovated in 2014 and 2015. In 2014, the kitchen, bathroom, washbasin, and toilet were completely redone, and the fixtures were replaced with new ones. The exterior walls were painted and the wallpaper was renewed. In 2015, the entrance was moved, a small room was added on the second floor, and a toilet was added on the third floor. The registration of the addition has been completed under the supervision of the architect. In addition, the roof is flat and waterproofing has been completed.
Floor Area: B1F: 19.01㎡ 1F: 23.37㎡2F: 24.46㎡ 3F: 11.55㎡
*Price changed on 2nd March, from 48.00M yen to 39.80M yen




































