Description
The building was completely renovated in 2014 and 2015. In 2014, the kitchen, bathroom, washbasin, and toilet were completely redone, and the fixtures were replaced with new ones. The exterior walls were painted and the wallpaper was renewed. In 2015, the entrance was moved, a small room was added on the second floor, and a toilet was added on the third floor. The registration of the addition has been completed under the supervision of the architect. In addition, the roof is flat and waterproofing has been completed.
Floor Area: B1F: 19.01㎡ 1F: 23.37㎡2F: 24.46㎡ 3F: 11.55㎡
*Price changed on 18th September, from 59.80M yen to 48.00M yen